★★★★★ 5/5 · 148 reviews on Google

Post-construction cleaning in Maastricht

After a renovation or new build, construction dust, cement, and paint residue always remain. Our post-construction cleaning removes all traces so you can immediately enjoy the result.

Insured and vetted cleaners, no worries
Instant quote with the form · anything that needs a look, within 2 hours
48-hour satisfaction guarantee
Insured & vettedSatisfaction guaranteeInstant quote

Free quote

No obligation
Protected · No obligation
148 real customer reviews
5/5 ★★★★★ Verified reviewsInsured
Why Claro Clean

Is there a layer of fine dust everywhere after the renovation that just will not go away?

Construction dust is stubborn and settles into every corner, gap, and ventilation grille. Simple vacuuming and mopping is not enough to fully remove it.

We remove fine construction dust from all corners, seams, and ventilation openings

We clean cement and paint residue from floors, windows, and frames

We make all newly installed appliances and fixtures ready to use

We ensure your home is immediately liveable after the renovation

Post-construction cleaning
Vetted team
How it works

Booking is easy

Three steps, no endless calls.

1

Tell us what you need

Fill in the form in 2 minutes. Questions? Message us on WhatsApp.

2

Your quote instantly

You see your quote on screen the moment you send the form, a fixed price with everything included. If your clean needs a look first, we email it within 2 hours.

3

Spotless result

An insured team leaves your space spotless. You just enjoy the result.

What's included

Everything we clean for you

Dust removal

Fine dust is removed from all corners, surfaces, and ventilation.

Floor cleaning

New floors are cleaned and cleared of construction residue.

Windows & frames

Stickers, paint, and dust are removed from windows and frames.

Sanitary cleaning

New fixtures are cleaned and made ready for use.

Kitchen appliances

New appliances are cleaned inside and out.

Walls & ceilings

Dust and splashes on walls and ceilings are cleaned away.

Professional cleaning

Post-construction cleaning in Maastricht

When you schedule the handover clean decides whether you pay once or twice. The right moment is after the last dust-producing operation and before the floor finish or the furniture, and that is rarely the date in the programme.

What is included

  • A date that follows the last building phase
  • Consultation with your builder on what is still to come
  • Postponement at no cost if the build overruns
  • Priority for rooms that come into use first
  • Written confirmation of the schedule

How we do it

We ask at enquiry which jobs are still to come and only then schedule. Sanding, sawing and drilling after the clean return everything to its former state, and that is the commonest reason a handover gets paid for twice.

What you get

Our people are insured and vetted and move an appointment at no charge when the builder overruns. Building programmes shift, and making you pay for that is not reasonable.

Post-construction cleaning in your area

Related guides

Real reviews

What our customers say

Real people, verified reviews.

★★★★★
Adil heeft de tuinset super schoon gekregen. Zes stoelen met 13 kussens en een grote tafel. Het is een topper!
Hans Hogers Verified
Katherine Beisler
Google review
★★★★★

Zeer snelle offerte, snelle afspraak, zeer vriendelijke en professionele service.

Verified
Rita Chantre
Google review
★★★★★

Gisteren contact opgenomen met CLAROCLEAN en vandaag is mij bankstel helemaal schoongemaakt en ruikt lekker fris. Super snel service en een aardig man. Dus ik ben tevreden en dankbaar voor de service.

Verified
Nicky B
Google review
★★★★

Grote hoekbank (3-delig) gereinigd. Blij dat ik mijn bank toch nog wat langer kan blijven gebruiken.

Verified
Guarantee

Satisfaction guarantee

If something is not right, tell us within 48 hours and we re-clean it free.

Insured cleanersVetted staffEco products
* Conditions apply.

Need post-construction cleaning in Maastricht?

Fill in the form and you see your quote instantly, everything included and no obligation. Anything we cannot price on the spot arrives by email within 2 hours.

Free quote

No obligation
Protected · No obligation
Frequently asked questions

Everything you need to know

When should I schedule the handover clean?
After the last dust-producing job and before the furniture goes in. Sanding or drilling afterwards puts you back to zero, and you effectively pay for the clean twice.
What if the builder overruns?
We move the appointment at no cost. A shifting building programme is normal, and charging a cancellation fee for it does not fit how we work.
Can it be done room by room while the rest is unfinished?
Yes, and on a phased renovation that is sensible. We do keep a strip clear at the doorway, or construction dust from the next phase walks straight back in.
WhatsAppGet a quote